Track record
Projects
Examples of the heavy, oversized and high-value cargo we move between Europe, China, the Caucasus and Central Asia.
- 01 Poti (GE) Jabrayil (AZ) Energy & power
Shafag Jabrayil Solar Power Plant project
Solar panels, cables and power pack units
- Plant capacity: 240 MW
- Road
- Port handling in Poti
- Obtaining permits
- 02 Bautino port (KZ) Talimarjan–Nuriston (UZ) Energy & power
Gas turbine generator to Uzbekistan
- 1 pc
- 309 t
- Dimensions (L × W × H): 14.70 × 4.31 × 5.20 m
- Modular trailers
- 03 Reinosa (ES)&Vipiteno (IT) Bakhvi, Ozurgeti (GE)via Türkiye Energy & power
Bakhvi Hydropower Plant (HPP)
- Road + RORO
- Standard tautliners
- Lowbed trailers
- 04 Poti (GE) Baku (AZ) Offshore & marine
Anchor wire ropes
- 2 reels
- 153 t each
- Dimensions (L × W × H): 5.2 × 3.8 × 3.8 m
- Road
- Modular trailers
- 05 Kutaisi (GE) Vale border crossing (GE) Energy & power
Transformer loading and route permits in Georgia
- 130 t
- Dimensions (L × W × H): 7.30 × 4 × 4.50 m
- Jack & slide loading from a basement onto a modular trailer
- Permits for the loaded transport: 38.75 × 4 × 4.80 m, 195 t total
- Arranging escorts and an overhead cable lifting crew
- 06 Tangshan, Hebei (CN) Raahe (FI)via the Caspian Sea Heavy industry
Mill shell from China to Finland
- 18 t
- Dimensions (L × W × H): 7.30 × 2.60 × 2.70 m
- Distance by road: ≈ 12,800 km
- Road + RORO
- Flatbed trailer
- 07 Bautino port (KZ) Poti (GE)via Alat port (AZ) Offshore & marine
Floating pipes from Kazakhstan to Georgia
- 183 pcs
- Sea + Road
- Caspian vessel charter
- Tilt trailers
- Port handling in Poti
- Delivery terms: FOB Poti
- 08 Poti (GE) Baku (AZ) Agriculture
John Deere cotton harvesters
- 21,375 kg each
- Dimensions (L × W × H): 10 × 3.65 × 4.1 m
- Road
- Port handling in Poti
- Lowbed trailers
- 09 Poti (GE) Aksai (KZ)via the Caspian Sea Oil & gas
Oilfield equipment to Kazakhstan
- 1 unit
- 36 t
- Dimensions (L × W × H): 4.09 × 2.47 × 4.09 m
- Road + Sea
- Lowbed trailers
- Breakbulk: Alat–Aktau
- Port handling in Poti, Alat and Aktau
- 10 Poti (GE) Baku (AZ) Construction
Crawler excavators
- 35,000 kg each
- Dimensions (L × W × H): 11.2 × 3.3 × 3.65 m
- Road
- Port handling in Poti
- Lowbed trailers
- OOG permits
- 11 Langenhagen (DE) Baku (AZ) Ravenna (IT) Oil & gas
Oilfield equipment: mobilisation and demobilisation
Longest and heaviest piece: Automated Riser Joint
- 35,000 kg
- Dimensions (L × W × H): 15.40 × 2.10 × 2.10 m
- High-value cargo
- Road
- Standard tautliners
- Mega trailers
- Lowbed trailers
- 12 Zhejiang, Jiangxi, Jiangsu (CN) Tbilisi (GE)&Gebze (TR)via the Caspian Sea Manufacturing
Lithium battery packs from China to Georgia and Türkiye
- 45 trucks
- Road + RORO
- Transhipment in Alashankou
- Box trailers
- Standard tautliners
- Delivery terms: EXW
- 13 Poti (GE) Shalkiya (KZ)via the Caspian Sea and Aktau Mining
Multimodal container transport from Georgia to Kazakhstan
Steel structures
- 130 TEU
- Rail + Sea + Road
- Open-top overheight containers
- Standard containers
- High-cube containers
- 14 Xuzhou (CN) Tbilisi (GE)via Kazakhstan and the Caspian Sea Construction
Mobile cranes from China to Georgia
Longest and heaviest piece: 50 t mobile crane
- ≈ 42 t
- Dimensions (L × W × H): ≈ 13.9 × 2.8 × 3.6 m
- Road + Rail + RORO
- Lowbed trailers
- Rail flatcars
- Delivery terms: EXW Xuzhou
- 15 Baku & Sumgayit Customs (AZ) Manufacturing
Ceramic tile factory
- Ongoing
- Import & export customs clearance formalities
- Certificates & permits
- Railway station handling
- Transportation